Building Process
Building Process
Land Preparation
Your block of land is prepared for construction. This includes earth moving and scraping, clearing of trees, bushes, and debris.
Slab Stage
The footprint of your home is pegged-out on the site. Footings, under slab drainage, moisture barrier and termite barriers are all prepared before your foundation slab is poured.
Frame Stage
The construction of external and internal walls. This includes reinforcing steel and conduit for electrics and pipes for plumbing, the roof frame, gutters, insulation, roof sheeting, trims.
Lock Up Stage
The installation of piping, wiring, plasterboard, sheeting of eaves, porch and patio ceiling are completed. External walls, all external doors and windows are installed.
Internal Fitout
Final details are sorted for the finishing touches. Plasterboard joins, cornice installation, waterproofing, tiling, cabinetry installation, skirting, doors, shelving.
Practical Completion Stage
Finally we come to the finishing touches, which includes paint, flooring, shower screens, fly screens, letterbox. Once all of this is completed, all waste is removed off site and a thorough clean of the house is completed prior to the final inspection before handover.